Engineered floor guns nail or staple guns used for engineered floors will be 18 or 20 gauge based on the guns manufacturer.
Uniclic engineered hardwood flooring installation instructions.
Manufacturers recommend that you install the planks with the tongue side against the wall and the groove side facing into the room.
Engineered hardwood guide to choosing a hardwood floor 10 things to know about hardwood installation how to clean hardwood room inspiration guide.
Align this plank and lock the side into place against the first plank in row 1.
The side of plank is then tapped lightly against the previously laid row.
For 3 8 engineered floors the minimum staple cleat is 1 for 9 16 engineered floors the recommended nail staple length is 1 1 4 1 1 2 long.
Pre inspect the job site prior to delivery of the floor to ensure the structure is suitable for hardwood flooring installation using the following.
The next plank is alignedwith the end joint first into the previ ously plank in row 2.
This installation method is identical to staple down only the fastener and fastening tool differ.
The side of plank is thentapped lightly against the previously laid row.
Instructions also availablevia cell phone using the qr code on the pre installation check list found in the box.
Installation instructions warranties brochures certifications sell sheets videos.
Uniclic the traditional glueless locking technology.
End joints on adjoining rows should be offset by no less than 6.
Use a pneumatic flooring stapler to drive staples through the groove at a 45 degree angle image 1.
Put a staple every 6 to 8 inches.
The next plank is aligned with the end joint first into the previously plank in row 2.
Uniclic locking technology for flooring panels.
Both solidwood and tecwood floors are a beautiful addition to your home and we re excited to help you get your installation started.
End joints on adjoining rows should be offset by no less than 6.
Align this plank and lock the side into place against the first plank in row 1.
The next plank is aligned with the end joint first into the previous plank in row 2.
All installation instructions must be followed for warranties to be considered valid.
Locking profile for both sides of the panels.
Epic plus engineered hardwood nailers staplers.
The side of plank is then tapped lightly against the previously laid row.
End joints on adjoining rows should be offset by no less than 6.